Need more information? Let us call you
T.B.S. Mechanical & Electrical Design & Build Ltd
263 Alcester Rd. South, Kings Heath, Birmingham B14 6DT
t: 0121 693 5575 f: 0121 693 5556
e: office@tbsmech.co.uk
Design & Installation
Click on the text links to view a different case study.
Klick Fitness & Daikin UK
TBS undertook a major M&E design & build project to rebrand and refurbish 9 No. Fitness First Clubs UK wide. The associated works involved full HVAC services refurbishment and replacement including hot and cold water services, ventilation systems, BMS controls systems and new air-conditioning systems through-out to all facilities.
TBS together with the client decided upon Daikin Uk when supplying and installing their new 'Self Cleaning' range of internal cassette units to provide heat pump air conditioning through-out the gym space and changing rooms which in turn illustrated an advanced cost saving in respect of ongoing maintenance routines and overall energy efficiency in running costs.
Klick Fitness Sites Uk:
Bromborough Liverpool, Aintree Liverpool, Sheffield Hillsborough, Wakefield, Ipswich, Stoke, Bradford, Gorton Manchester, Whitefield Manchester
Please select a case study from the links below:
- Fitness First Baker Street London
- Superdrug
- 3 Store Worksop
- Forest Holidays Forest of Dean – Water supply infrastructure
- Moseley Hall Hospital – New Plantroom
- WMFS Wednesbury Fire Station
- Klick Fitness & Daikin UK
- Cadbury College Bourneville
- Fitness First Brierley Hill
- Fitness First Brighton
- Leicester Mail Centre